Leamington Spa Bathing Rivers Station Approach
Station Approach (Part of Leamington Spa Bathing Rivers Project) - Installation of Shaft Storage Tank, that will slow the flow of collected rainwater and reduce the rainwater flows within the local drainage system.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |

Catthorpe - Rugby (WwTW)
- Installation of new Water storage tank & Gravity Sewer within Rugby.
- New Gravel hardstanding, Kerbs & paving along with street furniture.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |


Calverton
Calverton WFD – Site Refurbishment/Improvement works to improve effluent quality.
This has included Major Civils Construction works as well as Mechanical, Electrical, Instrumentation Install and Commissioning
![]() |
---|
![]() |
![]() |

Mech & Electrical Install
MEICA Works – Installation of all Mechanical, Electrical, Instrumentation and Commissioning works throughout the water industry, to allow chemical dosing of waste water to be cleaned and fed back into our rivers.
![]() | ![]() |
---|---|
![]() | ![]() |

![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |
![]() |
Leamington Spa Bathing Rivers Milverton School
Installation of Storm Attenuation Tank, that will slow the flow of collected rainwater and reduce sewage spills into the river.
Part of Separation Area 2 works which has included large scale Civil excavation, Installation of a huge attenuation Tank and underground pipework.
Hixon
Preparation works for the temporary bridge installation at Hixon is well underway with completion of the bridge abutment pour.
![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() |


![]() | ![]() |
---|---|
![]() | ![]() |
![]() |
National Emergency Area Retrofit (NEAR) for National Highways
Delivery of the National Emergency Area Retrofit (NEAR) programme for National Highways Across 2 Schemes.
Along the M1 & M5 36 new extra emergency areas are now open for use along sections of the Highway.
28 new EA's along the M1 & 10 new EA's along the M5.